Northeast Kansas Community Action Program, Inc.
 Seneca Headstart
 209 North 8th Street
 Seneca, Kansas 66538
 

Project Details:

 Structures - Signal Springs Play Structure in “playful” colors, Blue, Red and Yellow. Structure complete with ADA transfer step, 4’ straight slide, vine climber, ship’s wheel panel, crawl tunnel, 4’ curved slide, single bass drum, window panel, rain wheel, bongo drums, two towers with classic 4’ paly events, 2 climbers

 Safety Surfacing and Playground Border - (28) 8” heavy plastic interlocking border timbers, geotextile fabric for weed control, and loose rubber in Earthtone color for safety surfacing 

Project Timeline from Order to Install- 3 months

Full Installation in October 2014 by Noah’s Park & Playgrounds

 Project Total: $19,000 - $24,000

*Please Note: Project total price range is based on order date. Price range above has not been adjusted for yearly price increases.