Categories

ADA Ramps


  • Future Discounts
  • Product Updates
  • Tips-News-Info

The Valley HOA Playground Project

The Valley HOA
835 NW 172nd St
Edmond, Oklahoma 73012
 

Project Details:

Structure- Quick Ship Structure 021 in the Neutral Color Scheme. Structure complete with Transfer Station, Rock Hole Climber, Ship's Wheel, (2) Line Roof, Gear Panel, Pod Climber, Wave Slide, Bench Panel, Left Turn Slide, Bones Bridge and Double Slide

Swing Equipment- 3-bay arch post frame with 4 belt swing seats and 2 bucket seats in Rainforest Green

Amenities- (2) 8' Solar Shades in Tan and Dark Green

Safety Surfacing and Playground Border- Six ounce geotextile fabric for weed control. (31) 12” tall heavy plastic border timbers and certified wood mulch surfacing  

Project Timeline from Order to Install- 4 months

Full Installation in March 2017/2018 by Noah’s Park & Playgrounds

Noah’s Sales/Project Representative: Stephen Shepherd

Project Total: $32,000 - $35,000

*Please Note: Project total price range is based on order date. Price range above has not been adjusted for yearly price increases.

The Valley HOA- Edmond, OK