Categories

ADA Ramps


  • Future Discounts
  • Product Updates
  • Tips-News-Info

Kanza Child Care Center Playground Project

Kanza Child Care Center

101 Charles Curtis Dr

Newkirk, OK 74647

Project Details:

Structures

Structure #1: Stamford Structure in Primary

Structure #2: Happy Hollow

Structure #3: Monterey Spark Structure in Primary

Structure #4: Thunder Basin Structure

Independent Play 

Talk Tubes in Primary, Rockwell Teeter Duo in PrimaryAero Spinner in Primary, and Filbert Frog Spring Rider and Poly Pony Spring Rider

Music Equipment

Rhythm Group of 3 Bongos, Chime Panel with Posts in Primary, and Percussion Panel Wall with Posts in Primary

Sport Play

Two Piece Tetherball Post Pkg 10' Galvanized Tetherball Post

Swings

Elite 3.5 Inch Arch Post, 2 Bay - 4 Seat, 2 Bay Belt Seat Package 

Safety Surfacing

12" Border Timbers and Certified Wood Fiber

Park Equipment

6' Portable Table with Black Legs and Blue Planks

32 Gallon Downtown Trash Receptacle in Black

Shade Structures

2 Shade Structures for Toddler Playground in Desert Sand

Project Timeline from Order to Install- 15 Months

Full Installation by Noah's Park & Playgrounds 

Project Total: $215,000-$225,000

*Please Note: Project total price range is based on order date. Price range above has not been adjusted for yearly price increases.

 

Kanza Child Care Center - Newkirk, OK