Frisco Ridge HOA Playground Project

ODB Investors, LLC
Frisco Ridge HOA
Common Area A
Yukon, OK 73009
 

Project Details:

Structure- Custom Playground Structure in rainforest green, tan and brown. Structure consisted of an ADA transfer station, spiral slide, wavy double bedway slide and a single wavy slide with a bench panel, hear panel, captain’s wheel, bongo drum, overhead rings, fireman’s pole and angled rock wall.

Swing Equipment- Single post 2-bay frame with 4 belt swing seats in rainforest green.

Safety Surfacing and Playground Border- Six ounce geotextile fabric for weed control and certified wood mulch surfacing.

Project Timeline from Order to Install- 3 months

Supervised Installation in June 2015 by Noah’s Park & Playgrounds’ CPSI and approx. 10-15 Frisco Ridge Volunteers

Project Total: $20,000 - $25,000

Please Note: Project total price range is based on order date. Price range above has not been adjusted for yearly price increases.

Frisco Ridge HOA- Yukon, OK