Categories

ADA Ramps


  • Future Discounts
  • Product Updates
  • Tips-News-Info

Canyon Ridge Intermediate School Playground Project

Mustang Public Schools
Canyon Ridge Intermediate School
3600 South Sara Road
Oklahoma City, Oklahoma 73064
 

Project Details:

Independent Play Equipment - Galaxy spinner in silver, lime and blue, F-4 spinner in sliver, lime and blue, The Cube in silver, yellow and black, Oxygen in silver, yellow and black, single post 1 bay swing with 2 belt swing seats in pacific blue, 4-bay bipod swing set with belt swing seats, tether post and ball

Amenities - (2) 8’ regal style benches without back

Safety Surfacing and Playground Border - Geotextile mat for weed control and engineered wood fiber and pea gravel for safety surfacing with (70) 12” heavy plastic border timbers with full ADA ramp system 

Project Timeline from Order to Install- 3 months

Full Installation in October 2013 by Noah’s Park & Playgrounds

Project Total: $74,000 - $79,000

*Please Note: Project total price range is based on order date. Price range above has not been adjusted for yearly price increases. 

Noah's Sales/Project Representative: Shan Shepherd 

canyon-ridge-1-resized.jpg

canyon-ridge-2-resized.jpg

canyon-ridge-3-resized.jpg